Meshtastic LongFast and the FCC: ADKMesh Is Watching the Discussion

A recent community discussion has raised questions about whether the familiar Meshtastic LongFast preset aligns with the FCC rules commonly used for unlicensed operation in the U.S. 902–928 MHz band.

We are keeping a close eye on the situation. ADKMesh is not making a legal determination or recommending an immediate network-wide change. We will post updates as clearer guidance becomes available from Meshtastic, hardware vendors, the FCC, or other reliable sources.

Why This Is Being Discussed

Meshtastic documents LongFast as using 250 kHz of bandwidth. The current text of 47 CFR § 15.247(a)(2) says digitally modulated systems operating under that section in the 902–928 MHz band must have a minimum 6 dB bandwidth of at least 500 kHz.

The topic gained more attention after the Meshtastic 2.8.0 alpha release changed first-time U.S. setups to default to LongTurbo, a 500 kHz preset, instead of LongFast. Existing configured nodes are not supposed to switch presets automatically during an ordinary upgrade.

This does not mean the FCC just issued a new LongFast-specific rule. It means the community is taking a closer look at how an existing rule may apply to common Meshtastic configurations. Actual compliance can also depend on measured emissions, power, antenna configuration, equipment authorization, and the rule section under which a device operates.

What ADKMesh Is Doing

  • Following official Meshtastic firmware and documentation updates.
  • Watching for model-specific guidance from radio and node manufacturers.
  • Reviewing how LongTurbo performs in terrain representative of the Adirondacks.
  • Avoiding a rushed change that could split the existing mesh.

LongFast and LongTurbo cannot communicate with each other. Any future regional transition would need to be coordinated and tested rather than handled one node at a time.

For now, operators should know their current firmware, region, modem preset, transmit power, radio hardware, and antenna configuration. We are not advising people to climb towers, retrieve remote nodes, or mass-flash alpha firmware based only on early community discussion.

More Information

The following links provide useful background. The community articles are perspectives, not official FCC guidance:

This post is a developing-news overview, not legal advice or an FCC equipment certification. We will revise it as authoritative information becomes available.

Leave a Reply

Your email address will not be published. Required fields are marked *